Port of Kokkola crane painting

Surface treatment of the port crane in the deepwater port of Kokkola. The work is challenging because the crane is 48 m high. Work began in mid-June and took about 45 working days depending on the weather. We used a combination of Inerta Mastic / Teknodur Combi 3430. The 49 m tall crane was a challenging work environment.